Concurrent Delays

By Aman Kahlon A delay is “concurrent” is a delay to the critical path of the project caused by multiple events not exclusively controlled by one...

Public Owner’s Duty to Act in Good Faith

Decision may be helpful for contractors dealing with government entities Most contractors have worked on projects that were delayed for reasons outside their control. Many...

Documentation 101

Sometimes disputes are simply unavoidable. Whether addressed at the project level or through litigation, construction disputes often involve a series of interrelated, complex issues...

Construction Sites

By Christopher Scott D'Angelo Much has been written since the pandemic related shut-down was imposed addressing what rights, liabilities, and remedies may exist between the...

Arbitration Expectations

By Aman Kahlon Arbitration is one of the preferred mechanisms of dispute resolution in the construction industry. Understanding how an arbitration will unfold is useful...

What Does it Mean When I See a Copyright on an...

Often we hear about an architect providing a copyright to its drawings. From a contractor’s perspective, what does this mean? Why does an architect...
BIM plan

A Detailed BIM Plan

Hstorically, the construction industry has been hesitant to embrace new technologies that move projects into the high tech/digitized world. This is so for many...

Emergency Preparedness

By Christopher Scott D’Angelo OSHA sums emergency preparedness as follows: Emergencies and disasters can strike anywhere and at any time bringing workplace injuries and illnesses...

U.S. Supreme Court: We Take Forum Selection Seriously, Even If It...

In the past, contractors may not have paid much attention to whether their contracts contained forum selection clauses to govern contractual disputes, but thanks...

“As-Built” Documents

By William S. Thomas  Current versions of the American Institute of Architects (AIA) family of contracts address responsibility for preparation of project documentation which reflects...